SPUR 366 LINE C over US 75 & ROSS AVE

US 75 & SP 366 INTRCHANGE · County 113, Texas · Built 1983 · 2 Lanes · 13,414 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180570004707261
Year Built
1983
Length
733.3 m (2405.8 ft)
Max Span
63.4 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
13,414
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.