PGBT (SH190) NB-Rp over Lake Ray Hubbard

IH 30 / PGBT interchange · County 113, Texas · Built 2012 · 2 Lanes · 8,941 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180570000911467
Year Built
2012
Length
279.2 m (916 ft)
Max Span
32.3 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
8,941
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.