Rose Hill Rd over IH 30

3.2 Mi E of IH 635 · County 113, Texas · Built 1986 · 4 Lanes · 4,473 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
180570000911369
Year Built
1986
Length
103.6 m (339.9 ft)
Max Span
25.9 m
Width
18.5 m (60.7 ft)
Lanes
4
Daily Traffic
4,473
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$31,000
Total Project Cost
$39,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.