SH 66 EB over Lake Ray Hubbard

4.2 MI E OF SH78 · County 113, Texas · Built 1999 · 3 Lanes · 21,169 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570000903417
Year Built
1999
Length
768.1 m (2520 ft)
Max Span
33.5 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
21,169
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.