SH 78 over Rupards Branch

1.25 MI N of IH 635 · County 113, Texas · Built 1923 · 6 Lanes · 22,446 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180570000902006
Year Built
1923
Reconstructed
1965
Length
18 m (59.1 ft)
Max Span
11.3 m
Width
27.6 m (90.6 ft)
Lanes
6
Daily Traffic
22,446
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,000
Total Project Cost
$10,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.