ENGLEMANN DR over DRAW
0.10 MI W OF SOAP TREE DR · County 085, Texas · Built 2015 · 2 Lanes · 168 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
33.176222, -96.527692
This bridge is in worse condition than 37.1% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 11 years old.
Nearby Bridges
CORKWOOD DR over DRAW
Built 2016
PRINCETON MEADOWS over TRIB TICKY CREEK
Built 2018
Beauchamp Blvd SB over Ticky Creek
Built 2023
Beauchamp Blvd NB over Ticky Creek
Built 2023
MONTE CARLO BLVD over TRIB TICKY CREEK
Built 2011
GENOA CT over TRIB TICKY CREEK
Built 1996
US 380 over TICKY CREEK
Built 1999
SAN REMO over TRIB TICKY CREEK
Built 1996
US 380 over DRAW
Built 1999
PARK TRAILS BLVD over DRAW
Built 2018
Bridge Details
- Structure #
- 180430ZA8951001
- Year Built
- 2015
- Length
- 9.1 m (29.9 ft)
- Max Span
- 1.5 m
- Width
- 19.5 m (64 ft)
- Lanes
- 2
- Daily Traffic
- 168
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.