LAKE FOREST DR over DRAW

0.70 MI N OF SH 121 · County 085, Texas · Built 2000 · 7 Lanes · 25,312 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
180430D00658002
Year Built
2000
Length
14.9 m (48.9 ft)
Max Span
2.7 m
Lanes
7
Daily Traffic
25,312
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.