W PARK BLVD EB over SPRING CREEK

0.30 MI W OF US 75 · County 085, Texas · Built 1980 · 3 Lanes · 10,514 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180430C02790003
Year Built
1980
Length
33.5 m (109.9 ft)
Max Span
16.8 m
Width
13 m (42.7 ft)
Lanes
3
Daily Traffic
10,514
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Unknown
Last Inspected
N/A
Est. Improvement
$7,000
Total Project Cost
$9,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.