HEARST CASTLE WAY over SPRING CREEK
0.20 MI E OF COIT RD · County 085, Texas · Built 1986 · 4 Lanes · 2,406 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.078811, -96.768528
This bridge is in worse condition than 38.2% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 40 years old.
Nearby Bridges
LEGACY DR over SPRING CREEK
Built 1984
ARCHGATE DR over WHITE ROCK CREEK TRIB
Built 1987
PRESTON MEADOW DR over WHITE ROCK CREEK TRIB
Built 1986
LEGACY DR over SPRING CREEK TRIBUTARY
Built 1979
COLONNADE DR over WHITE ROCK CREEK TRIB
Built 1991
INDEPENDENCE PKWY over SPRING CREEK
Built 2001
INDEPENDENCE PKWY over YOUNGS BRANCH
Built 2005
INDEPENDENCE PKWY over SPRING CREEK TRIBUTARY
Built 1970
OHIO DR over WHITE ROCK CREEK TRIB
Built 1986
MAUMELLE DR over SPRING CREEK TRIBUTARY
Built 1978
Bridge Details
- Structure #
- 180430C01733001
- Year Built
- 1986
- Length
- 19.5 m (64 ft)
- Max Span
- 9.8 m
- Width
- 22 m (72.2 ft)
- Lanes
- 4
- Daily Traffic
- 2,406
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,000
- Total Project Cost
- $8,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.