E PLANO PKWY over BECK BRANCH TRIBUTARY
0.45 MI E OF JUPITER RD · County 085, Texas · Built 1975 · 7 Lanes · 28,757 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
33.007039, -96.673619
This bridge is in worse condition than 78.8% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 51 years old.
Nearby Bridges
E PLANO PKWY over BECK BRANCH
Built 1975
SUMMIT AVE over BECK BRANCH
Built 1983
SH 190 over DRAIN
Built 1990
JUPITER RD over BECK BRANCH
Built 1975
SHILOH RD over BECK BRANCH
Built 1980
PGBT WB over JUPITER RD
Built 1999
PGBT EB over JUPITER RD
Built 1996
PGBT EB over RENNER RD
Built 1999
PGBT WB over RENNER RD
Built 1999
SH 190 over DRAIN
Built 1991
Bridge Details
- Structure #
- 180430C01045023
- Year Built
- 1975
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Lanes
- 7
- Daily Traffic
- 28,757
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.