HEADQUARTERS (EB) over DALLAS NORTH TOLLWAY

0.5 MI S OF SH 121 · County 085, Texas · Built 2003 · 6 Lanes · 5,305 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180430C01040019
Year Built
2003
Length
54 m (177.2 ft)
Max Span
29 m
Width
25.8 m (84.6 ft)
Lanes
6
Daily Traffic
5,305
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.