DNT RAMP NB over NB Entrance Ramp

0.1 Mi N of US 380 · County 085, Texas · Built 2023 · 1 Lanes · 8,709 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
1804309D0470072
Year Built
2023
Length
253.3 m (831 ft)
Max Span
38.1 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
8,709
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.