DN TOLLWAY NB over PGA PARKWAY

1.0 MI S OF US 380 · County 085, Texas · Built 2007 · 3 Lanes · 85,136 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
1804309D0470056
Year Built
2007
Reconstructed
2023
Length
94.2 m (309.1 ft)
Max Span
39.3 m
Width
23.8 m (78.1 ft)
Lanes
3
Daily Traffic
85,136
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.