DN TOLLWAY NB over JOHN HICKMAN PARKWAY

1.7 MI N OF SH 121 · County 085, Texas · Built 2008 · 3 Lanes · 10,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1804309D0470033
Year Built
2008
Length
90.5 m (296.9 ft)
Max Span
31.4 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
10,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.