PGBT EB over CUSTER PKWY

SH 190 @ Custer Pkwy. · County 085, Texas · Built 1999 · 5 Lanes · 59,366 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180430296405554
Year Built
1999
Length
102.7 m (336.9 ft)
Max Span
41.8 m
Width
23.8 m (78.1 ft)
Lanes
5
Daily Traffic
59,366
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.