FM 455 over HONEY CREEK

5.80 MI E OF SH 289 · County 085, Texas · Built 2021 · 2 Lanes · 2,038 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
180430081604196
Year Built
2021
Length
59.4 m (194.9 ft)
Max Span
19.8 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
2,038
Material
Prestressed Concrete
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.