SH 121 SB over CLEMONS CREEK

0.90 MI. NE Of FM 545 · County 085, Texas · Built 2017 · 2 Lanes · 6,814 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180430054903224
Year Built
2017
Length
76.2 m (250 ft)
Max Span
27.4 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
6,814
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.