SRT NBML over PARKWOOD BOULEVARD
0.5 MI NE OF DNT · County 085, Texas · Built 2008 · 4 Lanes · 65,518 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.093228, -96.814497
This bridge is in worse condition than 38.2% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 18 years old.
Nearby Bridges
SRT SBML over PARKWOOD BOULEVARD
Built 2008
SH 121 S TO DNT over PARKWOOD BLVD
Built 2011
SH 121 NB RAMP A over SRT NB ON RAMP B
Built 2009
SH 121 NB RAMP over PARKWOOD BOULEVARD
Built 2021
SH 121 S TO DNT N over SH 121 SBFR & DNT NBFR
Built 2011
DNT N TO SRT N over DNT NBFR & SH 121 NBFR
Built 2011
SH 121 S TO DNT over EXIT RAMP TO SH 121 SBFR
Built 2011
HDQ-NDNT & DNT NB over SRT TOLL RD
Built 2009
SH 121 SB over DNT FRONTAGE ROADS
Built 2009
DNT S TO SH 121 N over DNT & SH 121
Built 2011
Bridge Details
- Structure #
- 180430036404165
- Year Built
- 2008
- Reconstructed
- 2020
- Length
- 99.4 m (326.1 ft)
- Max Span
- 36.6 m
- Width
- 25 m (82 ft)
- Lanes
- 4
- Daily Traffic
- 65,518
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.