SH 121 NBFR over COTTONWOOD CREEK

1.7 MI W OF US 75 · County 085, Texas · Built 2005 · 3 Lanes · 27,894 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180430036404141
Year Built
2005
Length
134.1 m (440 ft)
Max Span
33.5 m
Width
15.5 m (50.9 ft)
Lanes
3
Daily Traffic
27,894
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$35,000
Total Project Cost
$44,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.