SH 78 WB over MUDDY CREEK

1.00 MI SW OF FM 544 · County 085, Texas · Built 2001 · 3 Lanes · 13,298 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180430028102048
Year Built
2001
Length
121.9 m (399.9 ft)
Max Span
24.4 m
Width
17.2 m (56.4 ft)
Lanes
3
Daily Traffic
13,298
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.