DAVIS RD over US 75
0.5 MI N INT US75 & TX121 · County 085, Texas · Built 2017 · 7 Lanes · 37 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.269944, -96.594672
This bridge is in worse condition than 78.8% of bridges in County 085. The average bridge in Texas is 0 years old; this one is 9 years old.
Nearby Bridges
SH 121 SB CONN over US 75
Built 2015
US 75NB SH121 CONN over US 75 NB FR
Built 2017
TELEPHONE RD over US 75
Built 2015
MELISSA ROAD over US 75
Built 2015
SH 121 NB over DART
Built 2018
SH 121 SB over DART
Built 2018
MELISSA RD over DRAW
Built 2007
US 75 SBFR over E FORK TRINITY RIVER
Built 2013
US 75 SB over East Fork Trinity River
Built 2014
US 75 NB ML over EAST FORK TRINITY RIVER
Built 2017
Bridge Details
- Structure #
- 180430004714657
- Year Built
- 2017
- Length
- 92.7 m (304.1 ft)
- Max Span
- 34.4 m
- Width
- 32.3 m (106 ft)
- Lanes
- 7
- Daily Traffic
- 37
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.