US 75 NB over FM 543

2.5 Mi NE of US 380 · County 085, Texas · Built 2015 · 4 Lanes · 67,568 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180430004714650
Year Built
2015
Length
111.9 m (367.1 ft)
Max Span
38.7 m
Width
22.3 m (73.2 ft)
Lanes
4
Daily Traffic
67,568
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.