US 75 over DRAW

0.7 MI S OF SH 121 · County 085, Texas · Built 2000 · 15 Lanes · 121,625 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
180430004706619
Year Built
2000
Reconstructed
2011
Length
15.2 m (49.9 ft)
Max Span
3 m
Width
112.8 m (370.1 ft)
Lanes
15
Daily Traffic
121,625
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.