US 75 SBML over COTTONWOOD CREEK

0.65 MI S OF FM 2786 · County 085, Texas · Built 1999 · 3 Lanes · 84,751 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180430004706395
Year Built
1999
Length
61 m (200.1 ft)
Max Span
21.3 m
Width
18.6 m (61 ft)
Lanes
3
Daily Traffic
84,751
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.