US 75 SBML over ROWLETT CREEK

1.90 MI S OF FM 2170 · County 085, Texas · Built 1992 · 5 Lanes · 80,567 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180430004706300
Year Built
1992
Reconstructed
2015
Length
85.3 m (279.9 ft)
Max Span
12.2 m
Width
22.3 m (73.2 ft)
Lanes
5
Daily Traffic
80,567
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.