SH 6 over Sandy Creek

1.0 MI S OF US 79 · County 395, Texas · Built 1956 · 4 Lanes · 20,587 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
171980004907114
Year Built
1956
Reconstructed
1972
Length
27.7 m (90.9 ft)
Max Span
9.1 m
Width
19 m (62.3 ft)
Lanes
4
Daily Traffic
20,587
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.