FM 2095 over BLACK CREEK

5.50 MI E OF US 77 · County 331, Texas · Built 1955 · 2 Lanes · 812 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
171660195301002
Year Built
1955
Length
22.9 m (75.1 ft)
Max Span
7.6 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
812
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$269,000
Total Project Cost
$404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.