OSR over RED BANK CREEK
2.95 MI NE OF FM 1452 · County 313, Texas · Built 2020 · 2 Lanes · 1,041 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
30.999233, -96.162806
This bridge is in worse condition than 31.1% of bridges in County 313. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
OSR over BRANCH OF CARRYALL CK
Built 2020
OSR over CARRYALL CREEK
Built 2019
OSR over COTTONWOOD CREEK
Built 2019
WATSON RD over CANEY CREEK
Built 2010
FM 3 over CARRYALL CREEK
Built 1954
FM 1452 over CANEY TRIBUTARY
Built 1979
FM 1452 over WEST CANEY CREEK
Built 1979
CR 459 over CARRYALL CREEK
Built 1990
OSR over CANEY CREEK
Built 1954
FM 3 over SWAN LAKE DRAW
Built 1975
Bridge Details
- Structure #
- 171540047503138
- Year Built
- 2020
- Length
- 22.9 m (75.1 ft)
- Max Span
- 7.6 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,041
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.