SH 7 over BUCK CREEK

4.95 MI E OF US 79 · County 289, Texas · Built 1947 · 2 Lanes · 2,858 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
171450033503015
Year Built
1947
Reconstructed
1988
Length
24.4 m (80.1 ft)
Max Span
9.1 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
2,858
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.