SH 75 over MILL BRANCH CREEK

1.73 MI N OF SH 7 · County 289, Texas · Built 2021 · 2 Lanes · 1,457 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

31.281628, -95.987675

This bridge is in worse condition than 36.5% of bridges in County 289. The average bridge in Texas is 0 years old; this one is 5 years old.

Nearby Bridges

Bridge Details

Structure #
171450016604206
Year Built
2021
Length
39.6 m (129.9 ft)
Max Span
39.6 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
1,457
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.