CR 132 over ROCKY CREEK BRANCH

5.0 MI E OF SH 90 · County 185, Texas · Built 1999 · 1 Lanes · 140 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
170940AA0388005
Year Built
1999
Length
8.4 m (27.6 ft)
Max Span
8.2 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
140
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$77,000
Total Project Cost
$116,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.