SH 105 over DRAINAGE AREA

6.1 MI E OF SH 6 · County 185, Texas · Built 2022 · 5 Lanes · 9,700 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
170940363502065
Year Built
2022
Length
10.4 m (34.1 ft)
Max Span
3 m
Lanes
5
Daily Traffic
9,700
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.