SH 75 over CANEY CREEK RELIEF

0.9 MI NW OF FM 833 · County 161, Texas · Built 1939 · 2 Lanes · 443 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
170820016602045
Year Built
1939
Length
36.6 m (120.1 ft)
Max Span
6.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
443
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.