CR 119 over DAVIDSON CREEK RELIEF
0.7 MI NE OF SH 36 · County 051, Texas · Built 1950 · 2 Lanes · 250 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
28.911525, -97.493483
This bridge is in worse condition than 89% of bridges in County 051. The average bridge in Texas is 0 years old; this one is 76 years old.
Nearby Bridges
SH 119 over DRAW
Built 1929
SH 119 over SMITH CREEK
Built 1998
CR 119 over DAVIDSON CREEK
Built 1950
CHARCO RD over DRAW
Built 2017
FM 884 over SMITH CREEK
Built 1958
FM 2980 over SMITH CREEK
Built 1977
EARNEST LEMKE RD over YORKTOWN CREEK
Built 1975
AFFLERBACH RD over HOOSIER CREEK
Built 1981
CHARCO RD over DRAW
Built 1930
SLICKFIELD RD over DRAW
Built 1930
Bridge Details
- Structure #
- 170260AA0190002
- Year Built
- 1950
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.8 m
- Width
- 6.6 m (21.7 ft)
- Lanes
- 2
- Daily Traffic
- 250
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $136,000
- Total Project Cost
- $204,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.