FM 2155 over BETHEL DRAW

0.2 MI N OF FM 1361 · County 051, Texas · Built 2017 · 2 Lanes · 805 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

30.441689, -96.422436

This bridge is in worse condition than 32.3% of bridges in County 051. The average bridge in Texas is 0 years old; this one is 9 years old.

Nearby Bridges

Bridge Details

Structure #
170260050604101
Year Built
2017
Length
16.8 m (55.1 ft)
Max Span
16.8 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
805
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.