COLLETTE LN over WICKSON CREEK TRIB

1.40 MI NE OF FM 2223 · County 041, Texas · Built 2000 · 2 Lanes · 49 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
170210AA0105001
Year Built
2000
Length
12.2 m (40 ft)
Max Span
11.3 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
49
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.