SH 30 over CARTER CREEK

0.4 MI NE OF SH 6 · County 041, Texas · Built 1960 · 2 Lanes · 14,771 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 6 Satisfactory

Location

30.635889, -96.295853

This bridge is in worse condition than 79.9% of bridges in County 041. The average bridge in Texas is 0 years old; this one is 66 years old.

Nearby Bridges

Bridge Details

Structure #
170210244601001
Year Built
1960
Reconstructed
1981
Length
38.1 m (125 ft)
Max Span
7.6 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
14,771
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,000
Total Project Cost
$14,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.