FM 630 over CHILTIPIN CREEK
0.60 MI E OF FM 796 · County 409, Texas · Built 1993 · 2 Lanes · 292 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
28.028975, -97.662386
This bridge is in worse condition than 69.7% of bridges in County 409. The average bridge in Texas is 0 years old; this one is 33 years old.
Nearby Bridges
FM 796 over CHILTIPIN CREEK
Built 1959
CR 32 (FM 796 ROW) over DRAW
Built 1968
CR 1098 (CR 32) over DRAIN
Built 1960
FM 796 over DRAW
Built 1955
SH 188 over DRAW
Built 2011
FM 630 over CHILTIPIN CREEK
Built 1994
IH 37 ML & EFR over DRAW
Built 1970
IH 37 WFR over DRAW
Built 1970
CR 21 over IH 37
Built 1970
CR 40 (IH 37 ROW) over DRAIN
Built 1970
Bridge Details
- Structure #
- 162050099401012
- Year Built
- 1993
- Length
- 21.6 m (70.9 ft)
- Max Span
- 3 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 292
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.