7.80 MI S OF FM 774 · County 391, Texas · Built 1965 · 2 Lanes · 3,394 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
28.191158, -97.215547
This bridge is in worse condition than 67.4% of bridges in County 391. The average bridge in Texas is 0 years old; this one is 61 years old.
Nearby Bridges
FM 2678 over MISSION RIVER
Built 1965
FM 2678 over MISSION RIVER S RELIEF
Built 1965
FM 2678 over DRAW
Built 1965
FM 2678 over DRAW
Built 1965
FM 2678 over DRAW
Built 1965
FM 2511 over MULLENS BAYOU
Built 1959
BELL ROAD over MULLENS BAYOU DRAW
Built 1975
BOENIG ROAD over MULLENS BAYOU
Built 1975
MULLENS BAYOU RD over MULLENS BAYOU
Built 1975
FM 136 over MULLENS BAYOU
Built 1992
Bridge Details
- Structure #
- 161960015506033
- Year Built
- 1965
- Reconstructed
- 1988
- Length
- 249.6 m (818.9 ft)
- Max Span
- 9.1 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 3,394
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,002,000
- Total Project Cost
- $2,503,000