PR 22 WB over EAST RELIEF CHANNEL

4.35 MI E OF SH 358 · County 355, Texas · Built 1981 · 3 Lanes · 16,333 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
161780061702048
Year Built
1981
Reconstructed
2004
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
16,333
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.