US 281 SB over NUECES RIVER
2.2 MI S OF SH 72 · County 297, Texas · Built 1958 · 2 Lanes · 5,067 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
28.428131, -98.178181
This bridge is in worse condition than 67.9% of bridges in County 297. The average bridge in Texas is 0 years old; this one is 68 years old.
Nearby Bridges
US 281 NB over NUECES RIVER
Built 1992
US 281 SB over SLOUGH E
Built 1958
US 281 NB over SLOUGH E
Built 1972
US 281 NB over SLOUGH D
Built 1972
US 281 SB over SLOUGH D
Built 1958
US 281 SB over SLOUGH C
Built 1958
US 281 NB over SLOUGH C
Built 1968
US 281 SB over SLOUGH B
Built 1958
US 281 NB over SLOUGH B
Built 1972
SH 72 over FRIO RIVER
Built 1947
Bridge Details
- Structure #
- 161490025401044
- Year Built
- 1958
- Reconstructed
- 1992
- Length
- 285.9 m (938 ft)
- Max Span
- 39.6 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 5,067
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,021,000
- Total Project Cost
- $2,526,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.