IH 37 EFR over HACKBERRY CREEK

2.9 MI NW OF SH 72 · County 297, Texas · Built 1937 · 2 Lanes · 160 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
161490007401029
Year Built
1937
Reconstructed
1957
Length
26.2 m (86 ft)
Max Span
3 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
160
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.