IH 37 EFR over BRUSH PEN HOLLOW CREEK

0.5 MI S OF FM 2049 · County 297, Texas · Built 1978 · 2 Lanes · 260 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
161490007307212
Year Built
1978
Length
37.8 m (124 ft)
Max Span
12.5 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
260
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$64,000
Total Project Cost
$80,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.