SH 123 over DRAW

2.70 MI N OF SH 80 · County 255, Texas · Built 1939 · 3 Lanes · 3,174 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
161290036606031
Year Built
1939
Reconstructed
1985
Length
7 m (23 ft)
Max Span
1.5 m
Lanes
3
Daily Traffic
3,174
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$80,000
Total Project Cost
$100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.