FANNIN RD over GOBBLER CREEK TRIB

2.90 MI S OF FM 622 · County 175, Texas · Built 1994 · 2 Lanes · 180 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
160890AA0176002
Year Built
1994
Length
15.5 m (50.9 ft)
Max Span
14.9 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
180
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$64,000
Total Project Cost
$80,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.