LUCAS RD over MUCORRERA CREEK
4.40 MI E OF TEMPLE ST · County 175, Texas · Built 1983 · 1 Lanes · 55 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
28.521456, -97.515564
This bridge is in worse condition than 32.5% of bridges in County 175. The average bridge in Texas is 0 years old; this one is 43 years old.
Nearby Bridges
LUCAS RD over GOAT CREEK
Built 2004
CLIP RD over GOAT CREEK
Built 1989
LUCAS RD over MILLERS CREEK
Built 1979
US 59 over MUJERRERO CREEK
Built 1929
US 59 over MILLERS CREEK
Built 1929
CR 421 over Blanco Creek
Built 2024
US 59 over GOAT CR
Built 2008
CLIP RD over SARCO CREEK
Built 1991
US 59 over BLANCO CREEK
Built 1930
FM 2441 over SARCO CREEK
Built 1955
Bridge Details
- Structure #
- 160890AA0120002
- Year Built
- 1983
- Length
- 25.9 m (85 ft)
- Max Span
- 25 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 1
- Daily Traffic
- 55
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $91,000
- Total Project Cost
- $114,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.