SH 239 over San Antonio River

0.4 Miles East of FM 2442 · County 175, Texas · Built 2023 · 2 Lanes · 1,812 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 7 Good

Location

28.735569, -97.643578

This bridge is in worse condition than 32.5% of bridges in County 175. The average bridge in Texas is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
160890051602017
Year Built
2023
Length
144.8 m (475.1 ft)
Max Span
38.1 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
1,812
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.