SH 239 over DRAW

2.3 MI NW OF US 59 · County 175, Texas · Built 1947 · 2 Lanes · 2,467 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
160890051602010
Year Built
1947
Reconstructed
2001
Length
7 m (23 ft)
Max Span
2.1 m
Width
17.6 m (57.7 ft)
Lanes
2
Daily Traffic
2,467
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$48,000
Total Project Cost
$60,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.