US 90 EB ML over EAST ELM CREEK

0.69 MI E OF UVALDE C/L · County 325, Texas · Built 1998 · 2 Lanes · 13,957 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
151630002404186
Year Built
1998
Length
68.6 m (225.1 ft)
Max Span
22.9 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
13,957
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.