Valley Hi Drive over IH 410

1.2 Mi S of US 90 · County 029, Texas · Built 1959 · 4 Lanes · 24,265 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
150150052105046
Year Built
1959
Length
63.1 m (207 ft)
Max Span
17.4 m
Width
20.4 m (66.9 ft)
Lanes
4
Daily Traffic
24,265
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$22,000
Total Project Cost
$28,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.